
Blue Sky Plan Manual
Explore the complete Blue Sky Plan 5.1 user manual, from setup to every planning module.
Browse by chapter, or search by title and keyword to jump straight to any section.
3.2 Project Setup
After selecting the module and planning type, the user enters the Project Setup flow, which consists of two interconnected steps. In the Project Settings the user has to create or select the patient, treatment, and select the planned jaw. In Data Import the user has to import the relevant data. When all these required steps are done, it is possible to start the actual planning that has been selected. Navigation between steps is provided by two blue arrows, Back and Next. Returning to the previous step (Back) is always allowed, while moving forward (Next) is only allowed if all the requirements for the current step have been fulfilled.


