top of page
bg.png

Blue Sky Plan Manual

Explore the complete Blue Sky Plan 5.1 user manual, from setup to every planning module.
Browse by chapter, or search by title and keyword to jump straight to any section.

27.12.2 Prepare IBT

This step includes drawing and editing the curve for indirect bonding tray fabrication similarly to the previous type of planning. The curve is drawn on the final position of teeth. The indirect bonding tray is generated for the first position model only. The default setting for IBT fabrication can be changed in Preferences.

bottom of page